60-day window on NFPA website
The 2020 National Electrical Code is currently open for comment, according to the NFPA 70 website. This comes as part of a 60-day window that will end August 30th.
The NEC is the benchmark for safe electrical design, installation, and inspection to protect people and property from electrical hazards.
Covered in the NEC 90.2 Scope are the following:
“(A) Covered. This Code covers the installation and removal of electrical conductors, equipment, and raceways; signaling and communications conductors, equipment, and raceways; and optical fiber cables and raceways for the following:
(1) Public and private premises, including buildings, structures, mobile homes, recreational vehicles, and floating buildings
(2) Yards, lots, parking lots, carnivals, and industrial substations
(3) Installations of conductors and equipment that connect to the supply of electricity
(4) Installations used by the electric utility, such as office buildings, warehouses, garages, machine shops, and recreational buildings, that are not an integral part of a generating plant, substation, or control center”
Test your knowledge of the most recent National Electrical Code below in this YouTube quiz:
First published in 1897, the NEC is updated and published every three years, with the 2017 edition being the most current. Most states adopt the most recent edition within a few of years of its publication. As with any “uniform” code, jurisdictions may regularly omit or modify some sections, or add their own requirements (sometimes based upon earlier versions of the NEC, or locally accepted practices). However, no court has faulted anyone for using the latest version of the NEC, even when the local code was not updated.